Project Location:

Bioretention Basin

Project Location:

Mechanicsburg, PA Naval Base

Property Owner:

United States Navy

Material:

5000 cu yds Custom Blend: Sand, STA Compost, Loam Soil

Installer:

Pinnacle Construction

Date Installed:

Fall, 2016


The Naval Support Activity Base is a large complex of expansive warehouses and paved surfaces. It was determined based on new BMP’s that the base was exceeding its impervious surface allowance. In an effort to manage the base’s stormwater from leaving the site, an obsolete warehouse was demolished and a large bioretention basin was installed in its footprint.