Gap By-Pass
A bypass connector loop road was installed to circumvent and ease congestion at the Route 30 and Route 41 intersection, a very busy, major transportation corridor. Several stormwater basins lined with a PennDOT specified amended soil with a high organic matter content, were strategically installed to capture the storm water runoff from the new road surface.
Project Location
Gap, PA
Property Owner
PennDOT
Materials
1500 cu yds Custom Blend: PennDOT Bioretention Soil
Installer
Allan Meyers