How Black Gold Helped Mercedes Benz Stadium Achieve Platinum

Home/engineered soil

engineered soil

February 20, 2018 by rbracey

PHOTOGRAPH COURTESY OF MERCEDES-BENZ STADIUM

Scott Jenkins is the General Manager of the newly-designed Mercedes-Benz Stadium in Atlanta, home of the Atlanta Falcons.  Scott had a vision to be #1, and was determined to make that happen when the facility opened in August of 2017.  And Scott got his wish, although maybe not in the way you might expect, as the Falcons fell to the Philadelphia Eagles for the NFC Division win that year.

But in the green building world, the Falcons’ home field is on the record books.  Mercedes Benz Stadium is the 1st professional sports stadium to achieve LEED Platinum Certification, which is a Super Bowl-esque sized win for Jenkins and his team of architects, planners, builders and installers.

One of the reasons MB Stadium was able to achieve this prestigious status was its incorporation of compost as part of its landscape and stormwater design plans.  150 tractor trailer loads of compost-enriched engineered soil was amended into native soil on site and  installed in bioswales and other water retention areas to capture, retain and manage high volumes of water runoff from large areas of impervious surfaces.

Many municipal ordinances and best practices require the addition of organic matter to existing soil whenever installation of plant material takes place.  A target of 5% organic matter in soil provides increases in the following:

  • Water retention
  • Nutrient retention
  • Microbial activity
  • Sustainability
  • Physical, chemical and biological properties

In addition, project material costs can be reduced by up to 2/3 when 2″ of compost is applied vs bringing in 6″ of topsoil, while also lowering the project’s carbon footprint.

Want to learn more?  Check out the video below for more information:

Filed Under: Uncategorized Tagged With: bio-retention soil, compost, engineered soil, laurel valley soils, LEED Certified, mushroom compost, organic matter, premium compost, STA Certified compost, stormwater management, US Compositng Council

October 2, 2017 by rbracey

We know how time sensitive stabilization can be when approaching the end of a project.  It is critically important to get your seed down and achieve germination before the November cut off.  Once a site is stabilized, converting the silt catch basins into functioning bioretention basins is the last key deliverable for dedication.

lvsphoto7-2

Having an experienced soil partner that understands the needs of your project is the key to achieving fast and successful slope stabilization and basin conversions.  Laurel Valley is a unique soil producer, as not only do we have a state of the art manufacturing facility, we have an experienced team who understands the chemistry and science of soils so we can make the quality compost and engineered soils that your projects require.

We have been in business since long before “bioretention Soil” was even a product; making compost for more than forty years and blending soil products for nearly twenty.  Specializing in PennDOT, Pennsylvania Turnpike Commission and Philadelphia Water Department specifications is just some of what we do.

headerTest_30

We take the science of soil seriously and we work closely with landscape architects, soil engineers, universities and soil testing laboratories.  Soil specifications and the soil submittal process have become very complicated.  Our in-depth understanding of soil blending and soil specifications allow us to provide accurate and competitive pricing up front.  Don’t allow yourself to get to the end of the project only to find out that you have budgeted for the wrong soil blend or have your soil submittal rejected.

You can have confidence in knowing that we provide the whole package from inventorying the highest quality ingredients with large volume production capacity to providing guidance through the bid process and delivering testing and submittals.  Consider Laurel Valley not only your go to manufacture but your trusted advisor.  Your success is our success.

Laurel Valley Soils Dirt Shed

Project Location:  Christiana Fashion Center, Christiana, DE

Bioretention Basin:  3225 cu yds DENREC B-14 Bio-Soil:  60% Sand, 10% STA Compost, 30% Mulch

Christiana Fashion Center

As part of a new outdoor retail shopping center, a stormwater management plan adhering to local BMP’s was developed.  Several bioretention basins were strategically placed throughout the property to capture stormwater runoff from the buildings and paved areas.

Christiana Fashion Center After

Project:  Aerzen USA, LEED-Certified Facility, Coatesville, PA

Rain Gardens:  200 cu yds of Rain Garden Soil:  50% sand, 25% compost, 25% native soil

FullSizeRender

Aerzen USA’s recent headquarters expansion was designed with environmental responsibility in mind.  The goal of this project was to double the office space, and add 30% more manufacturing area while including as many green building practices as possible.  In addition to the rain gardens, Aerzen incorporated solar panels, geothermal heating and cooling, and a garden which produces 250 lbs of vegetables per year that are donated to local food banks.

IMG_8931

Project Location:  Applecross, Downingtown, PA

Bioretention Basin:  800 cu yds of Bioretention Soil:  40% sand, 30% compost, 30% native soil

A Bioretention Basin was installed to manage stormwater runoff within this golf course and housing community.

Applecross

Project Location:  Wegman’s, Glen Mills, PA

Bioretention Basin:  1518 cu yds Bioretention Soil:  35% STA compost, 20% sand, 45% native soil

Wegman's

Project Location:  Pennsylvania Turnpike, Northbound Shoulder, South of Exit 105

Shoulder Stabilization:  Enriched Topsoil

Bear Creek-1

Laurel Valley Soils Enriched Topsoil was installed for road shoulder stabilization as part of a new interchange project on the Pennsylvania Turnpike.

Bear Creek-4

Have questions?  Want to see how we can help YOU?  Contact us!  Jake@LVSoils.com.  610-268-5555.

Filed Under: Uncategorized Tagged With: Aerzen USA, bio-retention soil, bioretention basin, compost, compost enriched topsoil, DNREC, engineered soil, laurel valley soils, mushroom compost, premium compost, rain garden soil, RAM-T, soil, soil blending, STA Certified compost

Footer

Laurel Valley Soils

Location

705 Penn Green Rd,
Landenberg, PA 19350-9204

Billing

P.O. Box 70,
Landenberg, PA 19350

Call Us

Phone 610-268-5555
Fax 610-268-8601

Helpful Links

  • Credit Application
  • STA Certified Compost
  • Social Giving

© 2022 Laurel Valley Soils. A subsidiary of Laurel Valley Farms, Inc. All Rights Reserved

Facebook Instagram Twitter LinkedIn
logo
  • Our Products
  • Our Projects
  • Our Process
  • About Us
    • Our History
    • Environmental Impact
    • LVS Updates
  • Contact Us
  • Coverage Calculator
  • Garden Center Locator
  • Pay Your Bill