Project Location:

Bioretention Basin

Project Location:

Gap, PA

Property Owner:

PennDOT

Material:

1500 cu yds Custom Blend: PennDOT Bioretention Soil

Installer:

Allan Meyers

Date Installed:

Spring 2016


A bypass connecter loop road was installed to circumvent and ease congestion at the Route 30 and Route 41 intersection, a very busy major transportation corridor. Several stormwater basins were strategically installed to capture the storm water runoff from the new road surface.